One opening, start to finish

A single oversized impact pivot door with a sidelite, installed in a courtyard by four Blue Diamond installers, photographed from start to finish.

Finished pivot door with sidelite, clean deck and glass
Pivot door on install day with protective film, tools and drop cloths
Install dayFinished
Left · install day

Hung, plumb, still protected

The door is set on its pivot and leveled. Factory film stays on the glass, drop cloths protect the deck, and the level stays out until the final check.

Right · finished

Clean glass, clean deck

Film off, hardware on, debris hauled away. The homeowner gets the opening back the way it should look, with nothing to clean up.

Phase 1Prep the opening
Installer checking the new frame inside the opening over drop cloths
01

Drop cloths go down first, and the new frame is checked inside the opening.

Installer working at the top of the tall frame
02

The installer works the top of the frame so it sits square in the wall.

Tools and level staged beside the opening
03

Level, tools and supplies are staged next to the opening before the glass arrives.

Phase 2Bring the glass in
Crew walking a wrapped panel through the home
04

The wrapped panel is walked through the house, keeping floors and walls clear.

Two installers carrying the oversized glass panel
05

Two installers carry the oversized impact panel by hand.

Installers maneuvering the panel past interior artwork
06

They turn it through the tight interior without touching the finishes.

Phase 3Set and adjust
Crew standing the panel upright at the opening
07

The panel is stood upright at the opening.

Crew tilting the panel into the frame
08

The crew tilts it into the frame together.

Installers seating the door on its pivot
09

The door is seated on its pivot point.

Installer on a ladder adjusting the top pivot
10

From the ladder, the top pivot is adjusted so the door swings true.

Installer checking the door with a level at the bottom
11

The bottom is checked against the level until the gaps are even.

Phase 4Finish and hand over
Door hung with film still on the glass and tools nearby
12

Hung and plumb, with the protective film still on.

Finished pivot door with clean glass
13

Film off and the deck cleaned.

Wide view of the courtyard with the finished door and palms
14

The wide view shows the door in its courtyard, framed by palms.

Free estimate

Get a free estimate

Your estimate is free and in-home. No pressure, no upselling. Tell us about your project, or call and talk to our team.

14021 SW 143 CT, Suite #8
Miami, FL 33186

CGC #1525419 · 786-584-0552

What do you need?
786-584-0552

Get a free estimate

Free in-home estimate. No pressure, no upselling. Prefer to talk? Call 786-584-0552.

What do you need?